Summerset Casebrook

Flexible concrete and carpentry delivery
This large-scale, multi-level project for Summerset Retirement Village involved supplying and installing concrete structures, formwork, reinforcing steel, Interspan floors, and associated craneage and propping. Brosnan’s strong early engagement and partnership approach enabled them to negotiate the follow-on timber framing package, providing structural timber framing and carpentry for the upper levels.
The team’s flexibility and ability to accelerate resources, peaking at 40 carpenters, helped overcome inconsistent timber frame and truss supplies, maintaining the programme and minimising delays. Close communication with the client ensured design information was managed efficiently, even as the concrete package design evolved.
Brosnan’s specialist project and site managers, with deep trades expertise, delivered alternative build solutions and maintained a ‘can-do’ attitude throughout. The project was completed with an exemplary safety record, zero defects, and minimal adjustments required after handover, reinforcing Brosnan’s reputation as a trusted partner for Summerset.

40
Carpenters supplied at project peak
2
Major packages: concrete and timber framing
21
Month delivery